Page 1 of 3
LIST OF ARTIFICIAL LIFT SYSTEMS & SERVICES CONTRACTS. (1995-2022)
Sl.
#
Contract #
Contract Title
Approx
Value
Period
Client
Location
Scope of Work
From To
01 22058419 Sucker Rod Pumping
Services
USD 175
Million
2022 2029 Kuwait
Oil
Company
KOC Oil
Fields
Provision of Design, Supply, installation, testing &
commissioning, operation & trouble shooting of surface & sub-
surface equipment related to Sucker Rod Pumping (SRP) system
for wells across KOC fields.
02 12040214 Sucker Rod Pumping
Services
USD 112
Million
2012 2017 Kuwait
Oil
Company
KOC Oil
Fields
Provision of Design, Supply, installation, testing &
commissioning, operation & trouble shooting of surface & sub-
surface equipment related to Sucker Rod Pumping (SRP)
s
y
stem for wells across KOC fields.
03 BPO/071/04 Supply, Installation
and Commissioning
of Sucker Rod
Pumping Units
USD 24
Million
2005 2010 Joint
Operations
(KGOC /
SAC Inc.)
Wafra
Fields
Procurement, Assembly, Installation and Commissioning of
Lufkin Pumping Units complete with electric motor/gas
engine prime movers on a turnkey basis.
Maintain Units in inventory as consignment stock and provide
to Company upon request.
Assemble and Install the units including concrete base, gas
en
g
ine and/or electric motor.
04 BPO/049/02 Supply, Installation
and Commissioning
of Sucker Rod
Pumping Units
USD 12
Million
2001 2005 Joint
Operations
(KGOC /
SAC Inc.)
Wafra
Fields
Procurement, Assembly, Installation and Commissioning of
Lufkin Pumping Units complete with electric motor/gas
engine prime movers on a turnkey basis.
Maintain Units in inventory as consignment stock and provide
to Company upon request.
Assemble and Install the units including concrete base, gas
engine and/or electric motor.
05 DG/H10/P97 Supply, Installation
and Commissioning
of Sucker Rod
Pumping Units
USD 12
Million
1997 2001 Joint
Operations
(KGOC /
SAC Inc.)
Wafra
Fields
Procurement, Assembly, Installation and Commissioning of
150 Lufkin Pumping Units complete with electric motor/gas
engine prime movers on a turnkey basis.
Maintain Units in inventory as consignment stock and provide
to Company upon request.
Assemble and Install the units including concrete base, gas
engine and/or electric motor.
Page 2 of 3
Sl.
#
Contract #
Contract Title
Approx
Value
Period
Client
Location
Scope of Work
From To
Initial Production Testing after commissioning of the units.
Well Diagnosis through Dynamometers and Fluid level
analysis to optimize production.
Replacement of Prime movers upon request.
Adjustments of stroke lengths and counterbalance.
06 JO/SC109/
SG05
Fluid Level &
Dynamometer
Survey Services for
JO Wells
USD 3
Million
2006 2011 Joint
O
perations
(KGOC/
SAC Inc.)
Wafra
Fields
Well Weighing and Diagnostic Services for sucker rod
pumped wells.
Acquisition of Fluid level data in the well bores and
acquisition of Dynamometer data to determine downhole
pumps condition, rod loading, surface unit loading, and prime
mover loading.
Analyze Dynamometer data and suggest optimization of
surface production equipment.
Surface and downhole equipment optimization through
prediction software’s like SROD$$
Desi
g
n of rod strin
g
for new sucker rod pumped wells.
07 JO/SC50/
FD00
Sub Surface Sucker
Rod Pumps
Maintenance and
Services
USD 2
Million
2001 2006 Joint
O
perations
(KGOC/
SAC Inc.)
Wafra
Fields
Well Weighing and Diagnostic Services for sucker rod
pumped wells.
Acquisition of Fluid level data in the well bores and
acquisition of Dynamometer data to determine downhole
pumps condition, rod loading, surface unit loading, and prime
mover loading.
Analyze Dynamometer data and suggest optimization of
surface production equipment.
Surface and downhole equipment optimization through
prediction software’s like SROD$$
Design of rod string for new sucker rod pumped wells.
08 JO/SC68/
PO03
Field Services &
Maintenance of
Oilfield Pumps
USD 6
Million
2005 2008 Joint
O
perations
(KGOC/
SAC Inc.)
Wafra
Field
Maintenance & repair of Company’s existing production
facilities & sucker rod pumping units.
Routine inspection of the production facilities & sucker rod
pumping units.
Provision of the field crews & equipment necessary to
perform the services.
Page 3 of 3
Sl.
#
Contract #
Contract Title
Approx
Value
Period
Client
Location
Scope of Work
From To
09 JO/SA08/FD
00
Field Service,
Testing and
Repairing of
Conventional &
Non-Conventional
Sucker Rod Pumping
Units
USD 12.5
Million
2001 2006 Joint
O
perations
(KGOC/
SAC
Inc.)
Wafra
Fields
Production GOR well testing services for the entire JO Fields,
Wafra using both two and three phase separators and also
multiphase flow meters.
10 JO/SA08/FD
00
Adjustment
Order
Supply, Install &
Commission Beam
Gas Compressors.
USD 1.5
Million
2005 2006 Joint
O
perations
(KGOC/
SAC Inc.)
Wafra
Field
Supply, Install & Commission Beam Gas Compressors on
Sucker Rod Pumping Units to increase production by reducing
back pressure.
11 SAT / SA
1/91
Service Agreement
for Surface and
Submersible Eqpt.
Maintenance
USD 40
Million
1991 2001 Joint
O
perations
(KOC /
SAT Inc.)
Wafra
Field
This service agreement covered supply and maintenance of
(ESP) submersible equipment and utilities including all related
surface equipment.
12 98B-224 Repair, exchange and
Installation of
Submersible Pumps
USD 52
Million
2001 2007
K
uwait Oil
Company
KOC
Fields
Provide Surface equipment and downhole ESP equipment
including pumps, motors, protectors, cable, cable reel, flat cable
extensions, switchboard, and transformers.
13 98B-224
Adjustment
Order # 06
Horizontal Pumping
Systems (HPS) for
Enhanced Effluent
Water Disposal in
South East Kuwait
USD 6
million
2003 2007 Kuwait
Oil
Company
KOC South
East
Kuwait
Near GC-2
Network of HPS for enhanced disposal of effluent water in
South East Kuwait. This enhanced HPS network is capable of
disposal of about 50,000 BPD of effluent water into two disposal
wells.
Design, Engineering, Installation and Operations of
Horizontal Pumping Systems for GC-1, GC-6, GC-11 and
GC-2 on a lease basis.
Maintain inventory of the water disposal in South East
Kuwait.
Maintain the level in the Holding Tank at GC – 2.
14 95B-210 Repair, exchange and
Installation of
Submersible Pumps
USD 27
Million
1995 2000
K
uwait Oil
Company
KOC
Fields
Provide Surface equipment and downhole ESP equipment
including pumps, motors, protectors, cable, cable reel, flat cable
extensions, switchboard, and transformers.